Trail Maintenance Day – February 20

We will meet up at the OTB tent, the tent will be set up in the parking lot or across the trailhead. A shuttle service will be provided from the OTB tent to the work site.
On the agenda: (1) Bay Loop Trail is overgrown and needs trimming. (2) Dragon’s Gate has a large limb that will require a chainsaw (3) One of the large structures on Strangler Fig has rotten wood that needs to be replaced (4) There’s a lot of large trash on Gilligan’s that needs to be removed for us to open up that portion of the trail.

rfwbs-slide